基于多目标优化的复杂热电联产系统运行规划 |
| 陈坚红,王国雲,左克清,张洪坤,鲍彦克 |
|
Operation planning of complex combined heat and power systems based on multi-objective optimization |
| Jianhong CHEN,Guoyun WANG,Keqing ZUO,Hongkun ZHANG,Yanke BAO |
| 图 10 热电厂各机组在24 h内的功率运行规划曲线 |
| Fig.10 Power operation planning curves for each unit of thermal power plant over a 24-hour period |
|