考虑信号控制的公交轨迹控制与站点充电协同方法 |
杨城城,高坤,金盛,白聪聪,戎栋磊,高熙,沈辛夷 |
Collaborative method of bus trajectory control and station charging considering signal control |
Chengcheng YANG,Kun GAO,Sheng JIN,Congcong BAI,Donglei RONG,Xi GAO,Xinyi SHEN |
图 13 当充电需求系数分别为0.2、0.4、0.6、0.8时的CEBs速度分布 |
Fig.13 Speed distribution of CEBs with charging demand coefficients of 0.2, 0.4, 0.6 and 0.8 |
![]() |