黏岩复合地层中盾构掘进引起的超欠挖分析 |
| 齐永洁,蒋熠诚,周建,章伟康,张迪,魏纲 |
|
Analysis of overexcavation and underexcavation caused by shield tunneling in clay and rock composite stratum |
| Yongjie QI,Yicheng JIANG,Jian ZHOU,Weikang ZHANG,Di ZHANG,Gang WEI |
| 图 16 数值模拟得到的总开挖率曲线与实测数据的对比 |
| Fig.16 Comparison of total excavation rate curves obtained by numerical simulation and measured data |
|