分隔型基坑施工对邻近地层及隧道位移的影响
周鼎文,韩磊,应宏伟,朱成伟,李慧慧

Effect of segregated pit construction on displacement of adjacent strata and tunnel
Dingwen ZHOU,Lei HAN,Hongwei YING,Chengwei ZHU,Huihui LI
表 4 施工顺序对隧道位移的影响
Tab.4 Influence of construction sequence on tunnel displacement
mm
施工顺序umaxSmax$\Delta {{D}}_{\mathrm{t}}$
上行线下行线上行线下行线上行线下行线
先近后远31.817.3−15.3−6.411.410.8
先远后近27.313.8−12.3−5.510.57.9