大跨度公铁两用斜拉-悬索协作体系桥断索动力响应 |
张兴标,王涛,姚森,叶华文,王路,白伦华 |
Dynamic response of cable fracture of long span road-rail cable-stayed suspension bridge |
Xingbiao ZHANG,Tao WANG,Sen YAO,Huawen YE,Lu WANG,Lunhua BAI |
图 13 工况1、4、6主梁竖向加速度响应 |
Fig.13 Acceleration response of main girder in working condition 1,4 and 6 |
![]() |