回应气候的高铁站房界面开敞策略与模拟验证 |
| 王楠,王劲柳,刘丛红 |
|
Interface opening strategy of high-speed railway station buildings in response to climate and verification by simulation |
| Nan WANG,Jin-liu WANG,Cong-hong LIU |
| 图 5 调整后的高架层平面及测点 |
| Fig.5 Adjusted plan of elevated floor and measure points |
|