回应气候的高铁站房界面开敞策略与模拟验证 |
王楠,王劲柳,刘丛红 |
Interface opening strategy of high-speed railway station buildings in response to climate and verification by simulation |
Nan WANG,Jin-liu WANG,Cong-hong LIU |
图 5 调整后的高架层平面及测点 |
Fig.5 Adjusted plan of elevated floor and measure points |
![]() |