回应气候的高铁站房界面开敞策略与模拟验证 |
| 王楠,王劲柳,刘丛红 |
|
Interface opening strategy of high-speed railway station buildings in response to climate and verification by simulation |
| Nan WANG,Jin-liu WANG,Cong-hong LIU |
| 图 3 基于建筑信息建模(BIM)的界面开敞策略验证流程 |
| Fig.3 Verification process of interface opening strategy based on building information modeling (BIM) |
|