高速公路行车风险路侧感知系统的设备优化布设
李立,平振东,徐志刚,汪贵平

Devices’ optimal deployment of roadside sensing system for expressway driving risk
Li LI,Zhen-dong PING,Zhi-gang XU,Gui-ping WANG
表 5 设备布设方案敏感性分析结果
Tab.5 Sensitivity analysis results of device deployment scheme
C/万元 y1y2/m
原始 Noise=1% Noise=5% Noise=10%
24.40 —,{231,315,399,503,587} —,{230,323,401,500,586} —,{228,315,402,500,587} —,{228,315,399,500,586}
71.52 {220,286,352,418,484,550},{83,154,616} {220,286,352,418,484,550},{71,154,616} {220,286,352,418,484,550},{71,154,616} {221,287,353,419,485,551},{71,155,617}
90.20 {89,155,221,287,353,419,485,551,617},{23} {89,155,221,287,353,419,485,551,617},{23} {89,155,221,287,353,419,485,551,617},{23} {89,155,221,287,353,419,485,551,617},{23}
104.28 {30,96,162,228,294,360,426,492,558,624,678},— {30,96,162,228,294,360,426,492,558,624,678},— {31,97,163,229,295,361,427,493,559,625,678},— {30,96,162,228,294,360,426,492,558,624,678},—