第II类机器人混流装配线的平衡与排序联合决策
孙宝凤,张新康,李根道,刘娇娇

Joint decision-making of balancing and sequencing for type-II robotic mixed-model assembly line
Bao-feng SUN,Xin-kang ZHANG,Gen-dao LI,Jiao-jiao LIU
图 2 工序排序向量、分配向量和工作站的关系
Fig.2 Relationship of process vector, allocation vector and workstation