基于Bi-LSTM的非等时距路基工后沉降滚动预测 |
| 陈伟航,罗强,王腾飞,蒋良潍,张良 |
|
Bi-LSTM based rolling forecast of subgrade post-construction settlement with unevenly spaced time series |
| Wei-hang CHEN,Qiang LUO,Teng-fei WANG,Liang-wei JIANG,Liang ZHANG |
| 图 9 修正BP神经网络模型与双曲线模型的预测结果 |
| Fig.9 Predicted values derived from modified BP neural network model and hyperbolic function model |
|