多跨连续梁桥顶推施工双导梁的优化分析 |
| 冀伟,邵天彦 |
|
Optimization analysis of double launching noses during launching construction of multi-span continuous girder bridge |
| Wei JI,Tian-yan SHAO |
| 图 6 第3顶推阶段的计算简图(0.5 < α < 1.0) |
| Fig.6 Sketch of third launching stage (0.5 < α < 1.0) |
|