多跨连续梁桥顶推施工双导梁的优化分析 |
冀伟,邵天彦 |
Optimization analysis of double launching noses during launching construction of multi-span continuous girder bridge |
Wei JI,Tian-yan SHAO |
图 5 第2顶推阶段的计算简图(0.5 < α < 1.0) |
Fig.5 Sketch of second launching stage (0.5 < α < 1.0) |
![]() |