站间操作者不同的并行拆卸线平衡问题优化
张则强,许培玉,蒋晋,张裕

Optimization of parallel disassembly line balancing problem with different operators between workstations
Ze-qiang ZHANG,Pei-yu XU,Jin JIANG,Yu ZHANG
表 4 电视机和电冰箱拆卸信息
Tab.4 Disassembly information of TV and refrigerator
任务编号 电视机 任务编号 电冰箱
tip /s tir /s cost /元 tip /s tir /s cost /元
1 50 35 20/10.5 1 47 33 18.8/9.9
2 10 7 4/2.1 2 24 17 9.6/5.1
3 3 5 1.2/1.5 3 10 7 4/2.1
4 7 5 2.8/1.5 4 20 14 8/4.2
5 24 30 9.6/9 5 16 20 6.4/6
6 2 4 0.8/1.2 6 20 24 8/7.2
7 10 13 4/3.9 7 20 14 8/4.2
8 18 13 7.2/3.9 8 75 53 30/15.9
9 4 3 1.6/0.9 9 30 21 12/6.3
10 4 3 1.6/0.9 10 7 10 2.8/3
11 4 3 1.6/0.9 11 15 18 65.4
12 4 6 1.6/1.8 12 10 7 4/2.1
13 4 3 1.6/0.9 13 28 20 11.2/6
14 4 3 1.6/0.9 14 20 22 8/6.6
15 4 6 1.6/1.8 15 25 18 10/5.4
16 4 3 1.6/0.9 16 18 13 7.2/3.9
17 4 3 1.6/0.9 17 18 13 7.2/3.9
18 4 3 1.6/0.9 18 7 10 2.8/3
19 17 12 6.8/2.6 19 15 17 6/5.1
20 16 11 6.4/3.3 20 10 7 4/2.1
21 7 5 2.8/1.5 21 5 4 2/1.2
22 3 2 1.2/0.6 22 25 18 10/5.4
23 3 2 1.2/0.6 23 40 28 16/8.4
24 4 3 1.6/0.9 24 60 42 24/12.6
25 2 4 0.8/1.2 25 28 20 11.2/6
26 2 4 0.8/1.2
27 2 4 0.8/1.2