站间操作者不同的并行拆卸线平衡问题优化
|
张则强,许培玉,蒋晋,张裕
|
Optimization of parallel disassembly line balancing problem with different operators between workstations
|
Ze-qiang ZHANG,Pei-yu XU,Jin JIANG,Yu ZHANG
|
|
表 1 P10和P8算例的拆卸信息 |
Tab.1 Disassembly information of P10 and P8 examples |
|
任务编号 | P10 | | 任务编号 | P8 | tip /s | tir /s | cost /元 | tip /s | tir /s | cost /元 | 1 | 14 | 10 | 5.6/3 | | 1 | 14 | 10 | 5.6/3 | 2 | 10 | 12 | 4/3.6 | 2 | 10 | 7 | 4/2.1 | 3 | 12 | 8 | 4.8/2.4 | 3 | 12 | 15 | 4.8/4.5 | 4 | 17 | 12 | 6.8/3.6 | 4 | 18 | 13 | 7.2/3.6 | 5 | 23 | 16 | 9.2/4.8 | 5 | 23 | 16 | 9.2/4.8 | 6 | 14 | 15 | 5.6/4.5 | 6 | 16 | 20 | 6.4/6 | 7 | 19 | 13 | 7.6/3.9 | 7 | 20 | 14 | 8/4.2 | 8 | 36 | 22 | 14.4/6.6 | 8 | 36 | 25 | 14.4/7.5 | 9 | 14 | 10 | 5.6/3 | − | − | − | − | 10 | 10 | 12 | 4/3.6 | − | − | − | − |
|
|
|