管幕预筑法顶管施工顺序对地表沉降的影响 |
| 杨松松,王梅,杜建安,郭勇,耿炎 |
|
Influence of construction sequence of pipe jacking by pipe-roof pre-construction method on ground surface settlement |
| Song-song YANG,Mei WANG,Jian-an DU,Yong GUO,Yan GEN |
| 图 10 轨道10顶管施工地表沉降模拟与实测值曲线 |
| Fig.10 Surface settlement simulation and measured curves for pipe jacking construction of track 10 |
|