基于XGBoost的隧道掘进机操作参数智能决策系统设计 |
| 王飞,龚国芳,段理文,秦永峰 |
|
XGBoost based intelligent determination system design of tunnel boring machine operation parameters |
| Fei WANG,Guo-fang GONG,Li-wen DUAN,Yong-feng QIN |
| 图 8 总推进力与贯入度的关系曲线 |
| Fig.8 Relationship between total thrust force and penetration rate |
|