基于延迟时间模型的不完全检修计划优化模型
|
刘葛辉,陈绍宽,金华,刘爽,彭宏勤
|
Optimum imperfect inspection and maintenance scheduling model considering delay time theory
|
Ge-hui LIU,Shao-kuan CHEN,Hua JIN,Shuang LIU,Hong-qin PENG
|
|
表 1 检修和退化参数估计结果 |
Tab.1 Parameters of inspection and maintenance and deterioration process |
|
系统序号 | 检修参数 | | 退化参数 | | 参数验证 | a | r | | m1 | l1−1 | m2 | l2 | | 统计量实际值 | 统计量参照值 | 通过检验 | 1 | 0.05 | 0.68 | | 1 | 0.003 | 5.347 6 | 126.344 0 | | 18.364 | 18.548 | 是 | 2 | 0.02 | 1.00 | | 1 | 0.011 | 1.857 1 | 124.111 0 | | 16.465 | 16.748 | 是 | 3 | 0.05 | 0.78 | | 1 | 0.020 | 5.678 7 | 112.360 3 | | 20.936 | 21.954 | 是 | 4 | 0.05 | 0.57 | | 1 | 0.006 | 3.063 3 | 180.541 0 | | 15.475 | 16.748 | 是 | 5 | 0.05 | 0.87 | | 1 | 0.011 | 5.639 2 | 99.360 3 | | 18.325 | 18.548 | 是 |
|
|
|