基于隧道掘进机掘进过程的岩体状态感知方法 |
张娜,李建斌,荆留杰,杨晨,陈帅 |
Prediction method of rockmass parameters based on tunnelling process of tunnel boring machine |
Na ZHANG,Jian-bin LI,Liu-jie JING,Chen YANG,Shuai CHEN |
图 5 TBM单刀推力与贯入度的关系拟合曲线 |
Fig.5 Fitting relation of thrust per cutter and penetration of TBM |
![]() |