Please wait a minute...
J4  2013, Vol. 47 Issue (11): 1904-1910    DOI: 10.3785/j.issn.1008-973X.2013.11.003
土木工程     
深水S型铺管收弃管作业分析
龚顺风1,徐普1,钟文军2,何宁2,燕晖2
1.浙江大学 结构工程研究所,浙江 杭州 310058;2.海洋石油工程股份有限公司,天津 300452
Analysis on abandonment and recovery of offshore pipeline for deepwater S-lay Operation
GONG Shun-feng1, XU Pu1, ZHONG Wen-jun2, HE Ning2, YAN Hui2
1. Institute of Structural Engineering, Zhejiang University, Hangzhou 310058, China;
2. Offshore Oil Engineering CO. LTD., Tianjin 300452, China
 全文: PDF  HTML
摘要:

为研究深水S型铺管收弃管(A/R)作业过程管道的形态与受力特性,运用刚悬链线理论建立管道静平衡微分方程,结合缆索受力与铺管船移动,给出迭代求解两阶段作业过程管道与缆索形态的数值计算方法,并开发收弃管作业计算分析程序,模拟2 000 m水深弃管操作过程.结果表明,第1阶段,铺管船需要向前移动,以使A/R绞车施加的张力保持不变,管道形态变得平缓,管道内张力逐步增加而弯矩减小;第2阶段,铺管船静止,A/R绞车施加的张力需要逐步减小,管道形态变陡,管道内张力减小而弯矩迅速增加.与铺管专业软件OFFPIPE计算得到的结果吻合较好,验证了计算分析程序的有效性和实用性,从而可为实际深水管道铺设设计提供理论依据.

Abstract:

To investigate the configurations and force characteristics of deepwater S-lay pipeline during abandonment and recovery (A/R) operation, the stiffened catenary theory was applied to establish the static equilibrium governing differential equation of a pipe element, combined with the mechanical analysis of cable and the movement of pipelay vessel, then numerical solution method was derived for the configuration of pipeline and cable during two stages of A/R operation, and the corresponding program was developed to carry out the numerical simulation on the abandonment process of offshore pipeline in 2 000 m water depth. The results show that in the first stage, the pipelay vessel has to move ahead so that the tension of A/R winch keeps invariable, along with the configuration of pipeline becoming flat gradually, the tension of the pipe increases whereas the bending moment decreases. In the second stage, the pipelay vessel maintains motionless, and the tension of A/R winch need decrease step by step; the configuration of offshore pipeline becomes increasingly steep along with the pipeline continuously being lowered, thus the tension of the pipe decreases whereas the bending moment increases rapidly. The results are compared with the ones obtained by the OFFPIPE software, and close agreement further demonstrates the effectiveness and practicality of this calculating program, which can offer the theoretical basis for the laying design of deepwater pipeline in the practical engineering.

出版日期: 2013-11-01
:  TE 973.1  
基金资助:

国家科技重大专项课题资助项目(2011ZX05027-002-005-011);国家自然科学基金资助项目(51009122).

作者简介: 龚顺风(1975-),男,副教授,博导,从事深水海底管道方面的研究.E-mail: sfgong@zju.edu.cn
服务  
把本文推荐给朋友
加入引用管理器
E-mail Alert
RSS
作者相关文章  

引用本文:

龚顺风,徐普,钟文军,何宁,燕晖. 深水S型铺管收弃管作业分析[J]. J4, 2013, 47(11): 1904-1910.

GONG Shun-feng, XU Pu, ZHONG Wen-jun, HE Ning, YAN Hui. Analysis on abandonment and recovery of offshore pipeline for deepwater S-lay Operation. J4, 2013, 47(11): 1904-1910.

链接本文:

http://www.zjujournals.com/eng/CN/10.3785/j.issn.1008-973X.2013.11.003        http://www.zjujournals.com/eng/CN/Y2013/V47/I11/1904

[1] LI Zhi-gang, WANG Cong, HE Ning, et al. An overview of deepwater pipeline laying technology [J]. China Ocean Engineering, 2008, 22(3): 521-532.
[2] DUAN Meng-lan, WANG Yi, ESTEFEN S, et al. An installation system of deepwater risers by an S-lay vessel [J]. China Ocean Engineering, 2011, 25(1): 139-148.
[3] GARCA-PALACIOS J, SAMARTIN A, NEGRO V. A nonlinear analysis of laying a floating pipeline on the seabed [J]. Engineering Structures, 2009, 31(5): 1120-1131.
[4] JENSEN G A, SFSTRM N, NGUYEN T D, et al. A nonlinear PDE formulation for offshore vessel pipeline installation [J]. Ocean Engineering, 2010, 37(4): 365-377.
[5] WANG Li-zhong, YUAN Feng, GUO Zhen, et al. Numerical analysis of pipeline in J-lay problem [J]. Journal of Zhejiang University-SCIENCE A∶Applied Physics & Engineering, 2010, 11(11): 908-920.
[6] SZCZOTKA M. A modification of the rigid finite element method and its application to the J-lay problem [J]. Acta Mechanica, 2011, 220: 183-198.
[7] YUAN Feng, GUO Zhen, LI Ling-ling, et al. Numerical model for pipeline laying during S-lay [J]. Journal of Offshore Mechanics and Arctic Engineering, 2012, 134(2): 17031-17039.
[8] DATTA T K. Abandonment and recovery solution of submarine pipelines [J]. Applied Ocean Research, 1982, 4(4): 247-252.
[9] 戴英杰, 宋甲宗, 冯刚. 海底管道收弃管作业分析[J]. 海洋工程, 2000, 18(3): 75-78.
DAI Ying-jie, SONG Jia-zong, FENG Gang. A study on abandonment and recovery operation of submarine pipelines [J]. Ocean Engineering, 2000, 18(3): 7578.
[10] 胡亮文. 拾弃管作业的大变形分析[D]. 大连: 大连理工大学, 2009.
Hu Liang-wen. The analysis for large deformation in abandonment and recovery operation of submarine pipeline [D]. Dalian: Dalian University of Technology, 2009.
[11] 龚顺风, 何勇, 周俊, 等. 深水海底管道S型铺设参数敏感性分析[J]. 海洋工程, 2009, 27(4): 87-95.
GONG Shun-feng, HE Yong, ZHOU Jun, et al. Parameter sensitivity analysis of S-lay technique for deepwater submarine pipeline [J]. Ocean Engineering, 2009, 27(4):87-95.
[12] GONG Shun-feng, CHEN Kai, CHEN Yuan, et al. Configuration analysis of deepwater S-lay pipeline [J]. China Ocean Engineering, 2011, 25(3): 519-530.
[13] PLUNKETT R. Static bending stresses in catenaries and drill springs [J]. Journal of Engineering for Industry, ASME, 1967, 89 (1): 31-36.
[14] Malahy C R. Offpipe users guide [M]. version 2.07. Houston: Robert C Malahy Company, 1996: 128.

[1] 龚顺风,陈源,金伟良,白勇,李志刚,赵冬岩. 高静水压力作用下深海油气管道的局部屈曲[J]. J4, 2012, 46(1): 14-19.