[1] VIANA A, SOUSA J. Using metaheuristics in multi-objective resource constrained project scheduling [J]. European Journal of Operational Research, 2000, 120(2): 359-374.
[2] ABBASI B, SHADROKH S, ARKAT J. Bi-objective resource-constrained project scheduling with robustness and makespan criteria [J]. Applied Mathematics and Computation, 2006, 180(1): 146-152.
[3] 熊鹰,匡亚萍. 施工项目工期-成本优化问题的蚁群算法[J]. 浙江大学学报:工学版, 2007, 41(1): 176-180.
XIONG Ying, KUANG Ya-ping. Using ant colony algorithm to solve construction time-cost trade-off problem [J]. Journal of Zhejiang University: Engineering Science, 2007, 41(1): 176-180.
[4] SLOWINSKI R. Multiobjective project scheduling under multiple-category resource constraints [C]∥ Advances in Project Scheduling. Amsterdam: Elsevier, 1989.
[5] MERKLE D, MIDDENDORF M, SCHMECK H. Ant colony optimization for resource-constrained project scheduling [J]. IEEE Transactions on Evolutionary Computation, 2002, 6(4): 333-346.
[6] KAWAMURA H, YAMAMOTO M, SUZUKI K, et al. Multiple ant colony algorithm based on colony level interactions [J]. IEICE Transactions on Fundamentals, 2000, 83-A(2): 371-379.
[7] 郏宣耀,藤少华. 双种群改进蚁群算法[J]. 计算机辅助工程, 2006, 15(2): 67-70.
JIA Xuan-yao, TENG Shao-hua. Dual population ant colony optimization algorithm [J]. Computer Aided Engineering, 2006, 15(2): 67-70.
[8] HANSEN M P, JASZKIEWICA A. Evaluating the quality of approximations to the nondominated set [R]. Lyngby: Technical University of Denmark, 1998.
[9] PATTERSON J H. A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem [J]. Management Science, 1984, 30(7): 854-867.
[10] 郑超,高连生. 蚁群算法在资源受限项目调度问题中的应用[J]. 计算机工程与应用, 2005, 41(27): 205-209.
ZHENG Chao, GAO Lian-sheng. Applications of ACO algorithm in resource-constrained project scheduling problems [J]. Computer Engineering and Applications, 2005, 41(27): 205-209.
[11] KOLISCH R, PADMAN R. An integrated survey of deterministic project scheduling [J]. Omega, 2001, 29(3): 249-272.
[12] SPRECHER A, KOLISCH R, DREXL A. Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem [J]. European Journal of Operational Research, 1995, 80(1): 94-102. |