Please wait a minute...
Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering)  2013, Vol. 14 Issue (3): 219-229    DOI: 10.1631/jzus.A12e0027
Civil Engineering and Architecture     
Erratum to: Bending behavior of double-row stabilizing piles with constructional time delay
Yang Yu, Yue-quan Shang, Hong-yue Sun
College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310058, China; Department of Ocean Science and Engineering, Zhejiang University, Hangzhou 310058, China
Download:     PDF (0 KB)     
Export: BibTeX | EndNote (RIS)      

Abstract  The original version of this article unfortunately contained a mistake. In p.597, the minus on the right side of Eq. (1) was incorrect. The correct version is given.

Key wordsWithout key words

The online version of the original article can be found at doi:10.1631/jzus.A1200027
     
Published: 04 March 2013
Service
E-mail this article 10.1631/jzus.A1200027”. Please open it by linking:http://www.zjujournals.com/xueshu/zjus-a/EN/abstract/abstract15560.shtml" name="neirong"> 10.1631/jzus.A1200027">
Add to my bookshelf
Add to citation manager
E-mail Alert
RSS
Articles by authors
Yang Yu
Yue-quan Shang
Hong-yue Sun
Cite this article:

Yang Yu, Yue-quan Shang, Hong-yue Sun. Erratum to: Bending behavior of double-row stabilizing piles with constructional time delay. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2013, 14(3): 219-229.

URL:

http://www.zjujournals.com/xueshu/zjus-a/10.1631/jzus.A12e0027     OR     http://www.zjujournals.com/xueshu/zjus-a/Y2013/V14/I3/219

No related articles found!