Please wait a minute...
Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering)  2013, Vol. 14 Issue (3): 219-229    DOI: 10.1631/jzus.A12e0027
Civil Engineering and Architecture     
Erratum to: Bending behavior of double-row stabilizing piles with constructional time delay
Yang Yu, Yue-quan Shang, Hong-yue Sun
College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310058, China; Department of Ocean Science and Engineering, Zhejiang University, Hangzhou 310058, China
Download:     PDF (0 KB)     
Export: BibTeX | EndNote (RIS)      

Abstract  The original version of this article unfortunately contained a mistake. In p.597, the minus on the right side of Eq. (1) was incorrect. The correct version is given.

Key words: Without key words

The online version of the original article can be found at doi:10.1631/jzus.A1200027
     
Published: 04 March 2013
Service
E-mail this article 10.1631/jzus.A1200027”. Please open it by linking:http://www.zjujournals.com/xueshu/zjus-a/EN/abstract/abstract15560.shtml" name="neirong"> 10.1631/jzus.A1200027">
Add to my bookshelf
Add to citation manager
E-mail Alert
RSS
Articles by authors
Yang Yu
Yue-quan Shang
Hong-yue Sun
Cite this article:

Yang Yu, Yue-quan Shang, Hong-yue Sun. Erratum to: Bending behavior of double-row stabilizing piles with constructional time delay. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2013, 14(3): 219-229.

URL:

http://www.zjujournals.com/xueshu/zjus-a/10.1631/jzus.A12e0027     OR     http://www.zjujournals.com/xueshu/zjus-a/Y2013/V14/I3/219

No related articles found!