10.1631/jzus.A12e0027," /> 10.1631/jzus.A12e0027,"/> 10.1631/jzus.A12e0027,"/>
Please wait a minute...
Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering)  2012, Vol. 13 Issue (8): 596-609    DOI: 10.1631/jzus.A1200027
Mechanics and Civil Engineering     
Bending behavior of double-row stabilizing piles with constructional time delay
Yang Yu, Yue-quan Shang, Hong-yue Sun
College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310058, China; Department of Ocean Science and Engineering, Zhejiang University, Hangzhou 310058, China
Download:     PDF (0 KB)     
Export: BibTeX | EndNote (RIS)      

Abstract  The bending behavior of double-row stabilizing plies is associated with the constructional time delay (CTD), which can be defined as the time interval between the installations of the front stabilizing pile and the rear stabilizing pile. This paper investigates the effect of CTD on the bending moments of double-row stabilizing piles and a method for determining the optimal CTD is proposed. The stabilizing pile is modeled as a cantilever pile embedded in the Winkler elastic foundation. A triangular distributed earth pressure is assumed on the pile segment in the sliding layer. The front stabilizing pile and the rear stabilizing pile are connected by a beam with pinned joints. The analytical solutions of bending moments on the front and the rear stabilizing piles are derived and the accuracy of bending moment solutions is validated by comparing the tensile strain measured from the Hongyan landslide project, Taizhou, Zhejiang, China. It is concluded that CTD has a significant influence on the bending moments of double-row stabilizing piles. An optimal CTD can be obtained when the maximum tensile stress in the front stabilizing pile is equal to that in the rear stabilizing pile, which is 1.4 months for the Hongyan landslide project.

Key wordsSubgrade reaction      Landslide      Stabilizing pile      Constructional time delay (CTD)      10.1631/jzus.A12e0027')" href="#">Bending moment

An erratum to this article can be found at doi:10.1631/jzus.A12e0027     
Received: 25 January 2012      Published: 03 August 2012
CLC:  TU473  
Service
E-mail this article 10.1631/jzus.A12e0027”. Please open it by linking:http://www.zjujournals.com/xueshu/zjus-a/EN/abstract/abstract15415.shtml" name="neirong"> 10.1631/jzus.A12e0027">
Add to my bookshelf
Add to citation manager
E-mail Alert
RSS
Articles by authors
Yang Yu
Yue-quan Shang
Hong-yue Sun
Cite this article:

Yang Yu, Yue-quan Shang, Hong-yue Sun. Bending behavior of double-row stabilizing piles with constructional time delay. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2012, 13(8): 596-609.

URL:

http://www.zjujournals.com/xueshu/zjus-a/10.1631/jzus.A1200027     OR     http://www.zjujournals.com/xueshu/zjus-a/Y2012/V13/I8/596

[1] Qi-hua Ran, Qun Qian, Wei Li, Xu-dong Fu, Xiao Yu, Yue-ping Xu. Impact of earthquake-induced-landslides on hydrologic response of a steep mountainous catchment: a case study of the Wenchuan earthquake zone[J]. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2015, 16(2): 131-142.
[2] Qi-hua Ran, Dan-yang Su, Qun Qian, Xu-dong Fu, Guang-qian Wang, Zhi-guo He. Physically-based approach to analyze rainfall-triggered landslide using hydraulic gradient as slide direction[J]. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2012, 13(12): 943-957.
[3] ZHU Lei, HUANG Jing-feng. GIS-based logistic regression method for landslide susceptibility mapping in regional scale[J]. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2006, 7(12): 9-.