Please wait a minute...
Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering)  2010, Vol. 11 Issue (12): 938-945    DOI: 10.1631/jzus.A1001096
APIEMS     
Dynamic robust optimal reorder point with uncertain lead time and changeable demand distribution
Masaki Tamura, Kazuko Morizawa, Hiroyuki Nagasawa
Department of Electrical and Information Systems Engineering, Graduate School of Engineering, Osaka Prefecture University, Sakai, Osaka 599-8531, Japan, Osaka Prefectural College of Technology, Neyagawa, Osaka 572-8572, Japan
Download:     PDF (0 KB)     
Export: BibTeX | EndNote (RIS)      

Abstract  In fixed order quantity systems, uncertainty in lead time is expressed as a set of scenarios with occurrence probabilities, and the mean and variance in demand distribution are supposed to be changeable according to a known pattern. A new concept of “dynamic robust optimal reorder point” is proposed in this paper and its value is calculated as a “robust optimal reorder point function with respect to reorder time”. Two approaches were employed in determining the dynamic optimal reorder point. The first is a shortage rate satisfaction approach and the second is a backorder cost minimization approach. The former aims at finding the minimum value of reorder point at each reorder time which satisfies the condition that the cumulative distribution function (CDF) of shortage rate under a given set of scenarios in lead time is greater than or equal to a basic CDF of shortage rate predetermined by a decision-maker. In the latter approach, the CDF of closeness of reorder point is defined at each reorder time to express how close to the optimal reorder points under the set of scenarios, and the dynamic optimal reorder point is defined according to stochastic ordering. Some numerical examples demonstrate the features of these dynamic robust optimal reorder points.

Key wordsReorder point      Lead time      Robust optimum      Uncertainty      Scenario     
Received: 28 November 2010      Published: 09 December 2010
CLC:  TP39  
Cite this article:

Masaki Tamura, Kazuko Morizawa, Hiroyuki Nagasawa. Dynamic robust optimal reorder point with uncertain lead time and changeable demand distribution. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2010, 11(12): 938-945.

URL:

http://www.zjujournals.com/xueshu/zjus-a/10.1631/jzus.A1001096     OR     http://www.zjujournals.com/xueshu/zjus-a/Y2010/V11/I12/938

[1] Qian Zhu, Xiao Xu, Chao Gao, Qi-hua Ran, Yue-ping Xu. Qualitative and quantitative uncertainties in regional rainfall frequency analysis[J]. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2015, 16(3): 194-203.
[2] Qing-yu Zhang, Xin-xing Li, Wei-li Tian, Ang-yi Fu, Wei-fei Du, Cui Wang. Scenarios for vehicular air pollutant emissions abatement: a case study in Hangzhou, China[J]. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2014, 15(9): 753-760.
[3] Yun Shi, Yin-feng Xia, Bi-hong Lu, Nan Liu, Lei Zhang, Su-jing Li, Wei Li. Emission inventory and trends of NOx for China, 2000–2020[J]. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2014, 15(6): 454-464.
[4] Jin Cheng, Gui-fang Duan, Zhen-yu Liu, Xiao-gang Li, Yi-xiong Feng, Xiao-hai Chen. Interval multiobjective optimization of structures based on radial basis function, interval analysis, and NSGA-II[J]. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2014, 15(10): 774-788.
[5] John E. D. Ekoru, Jimoh O. Pedro. Proportional-integral-derivative control of nonlinear half-car electro-hydraulic suspension systems[J]. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2013, 14(6): 401-416.
[6] Yu-geng Tang. Probability-based method using RFEM for predicting wall deflection caused by excavation[J]. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2011, 12(10): 737-746.
[7] Hong-tao Bai, Hui-zhi Wang, He Xu, Tan Zhu. Quantitative evaluation of air pollution in transport strategic environmental assessment: a case study based on uncertainty analysis and graphic information system technology[J]. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2010, 11(5): 370-381.
[8] Yue-ping XU, Harriette HOLZHAUER, Martijn J. BOOIJ, Hong-yue SUN. A two-step approach to investigate the effect of rating curve uncertainty in the Elbe decision support system[J]. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2008, 9(9): 1229-1238.
[9] ZHANG Qing-yu, WEI Yu-mei, CHEN Ying-xu, GUO Hui. Environmental damage costs from fossil electricity generation in China, 2000~2003[J]. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2007, 8(11): 1816-1825.
[10] MENG Li, WANG Ding-wei. Research of relationship between uncertainty and investment[J]. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2005, 6( 4): 14-.
[11] SU Hong-ye, HU Jian-bo, LAM James. ROBUST STABILIZATION OF UNCERTAIN TIME-DELAY SYSTEMS CONTAINING NONLINEAR SATURATING ACTUATORS[J]. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2000, 1(3): 241-248.