Please wait a minute...
Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering)  2006, Vol. 7 Issue (4 ): 18-    DOI: 10.1631/jzus.2006.A0597
    
The single-machine scheduling problems with deteriorating jobs and learning effect
Cheng Ming-bao, Sun Shi-jie
Department of Mathematics, Shanghai University, Shanghai 200444, China
Download:     PDF (0 KB)     
Export: BibTeX | EndNote (RIS)      

Abstract  In this paper we consider a single-machine scheduling model with deteriorating jobs and simultaneous learning, and we introduce polynomial solutions for single machine makespan minimization, total flow times minimization and maximum lateness minimization corresponding to the first and second special cases of our model under some agreeable conditions. However, corresponding to the third special case of our model, we show that the optimal schedules may be different from those of the classical version for the above objective functions.

Key wordsScheduling      Single-machine      Learning effect      Deteriorating jobs     
Received: 25 June 2005     
CLC:  O223  
Cite this article:

Cheng Ming-bao, Sun Shi-jie. The single-machine scheduling problems with deteriorating jobs and learning effect. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2006, 7(4 ): 18-.

URL:

http://www.zjujournals.com/xueshu/zjus-a/10.1631/jzus.2006.A0597     OR     http://www.zjujournals.com/xueshu/zjus-a/Y2006/V7/I4 /18

[1] Yi-cong Gao, Yi-xiong Feng, Jian-rong Tan. Multi-principle preventive maintenance: a design-oriented scheduling study for mechanical systems[J]. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2014, 15(11): 862-872.
[2] José Luís Ponz-Tienda, Eugenio Pellicer, Víctor Yepes. Complete fuzzy scheduling and fuzzy earned value management in construction projects[J]. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2012, 13(1): 56-68.
[3] Hai-en Fang, Jie Zhang, Jin-liang Gao. Optimal operation of multi-storage tank multi-source system based on storage policy[J]. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2010, 11(8): 571-579.
[4] Yu-dong Xue, Takashi Irohara. A time-space network based international transportation scheduling problem incorporating CO2 emission levels[J]. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2010, 11(12): 927-932.
[5] Yu-chuan Liu, Shih-ming Yang, Yu-te Lin. Fuzzy finish time modeling for project scheduling[J]. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2010, 11(12): 946-952.
[6] Azuma Okamoto, Mitsumasa Sugawara. Solving composite scheduling problems using the hybrid genetic algorithm[J]. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2010, 11(12): 953-958.
[7] Shervin VAKILI, Sied Mehdi FAKHRAIE, Siamak MOHAMMADI, Ali AHMADI. Low-cost fault tolerance in evolvable multiprocessor systems: a graceful degradation approach[J]. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2009, 10(6): 922-926.
[8] Zhi-gang GAO, Zhao-hui WU. Schedulability analysis for linear transactions under fixed priority hybrid scheduling[J]. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2008, 9(6): 776-785.
[9] Feng SHE, Han-wen LUO, Lei CHEN, Hua XIA. Power duality for multi-antenna OFDM system in broadcast channel with user scheduling[J]. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2008, 9(2): 215-224.
[10] Ehsan Ullah MUNIR, Jian-zhong LI, Sheng-fei SHI, Zhao-nian ZOU, Qaisar RASOOL. A new heuristic for task scheduling in heterogeneous computing environment[J]. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2008, 9(12): 1715-1723.
[11] WANG Ji-min, PAN Xue-zeng, WANG Jie-bing, SUN Kang. Fast combination of scheduling chains under resource and time constraints[J]. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2007, 8(1 ): 17-.
[12] HAN Shu-guang, JIANG Yi-wei, HU Jue-liang. Online algorithms for scheduling with machine activation cost on two uniform machines[J]. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2007, 8(1 ): 18-.
[13] Ji Xin, Pollin Sofie, Lenoir Gregory, Lafruit Gauthier, Dejonghe Antoine, Catthoor Francky. Multi-user Motion JPEG2000 over wireless LAN: Run-time performance-energy optimization with application-aware cross-layer scheduling[J]. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2006, 7(Supplement 1): 151-158.
[14] Tu Wei, Chakareski Jacob, Steinbach Eckehard. Rate-distortion optimized frame dropping and scheduling for multi-user conversational and streaming video[J]. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2006, 7(5): 864-872.
[15] Jiang Yi-wei, He Yong, Tang Chun-mei. Optimal online algorithms for scheduling on two identical machines under a grade of service[J]. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 2006, 7(3): 309-314.