北仑电厂取、排水对算山25万吨级码头的影响
The Effects of the Water,Intake and Drainedby Beilun Power Plant,on the Tidal Current Field Nearthe Wharf Area of Suan-Shan 250000t
 全文: PDF(455 KB)   HTML (
摘要: 本文采用破开算子法建立一个二维潮流数学模型,用于分析研究宁波北仑电厂取、排水对镇海石化总厂算山码头25万吨级泊位附近潮沐流态的影响.计算结果表明,电厂取、排水影响码头附近横向水流流速并不大,约3. 0厘米/秒,小潮和憩流期间则更小,因此对超大型油轮靠泊、系泊影响不大.
Abstract: In this paper,a two-dimensional mathematical model is used to analyse the tidal current field,near250000t wharf of Zhenhai General Petrochemical Plant,and the effect of the water intake and drained in-to the area by Beilun Power Plant. In numerical calculation,an operator-splitting technique is applied.The calculation results show that the lateral velocity, produced by drained water,is merely 3. 0 cm/sand have no effect on the large-scale ship berth一operating.
出版日期: 2018-02-28
服务  
把本文推荐给朋友
加入引用管理器
E-mail Alert
RSS
作者相关文章  
周起舞
蔡体录

引用本文:

周起舞;蔡体录. 北仑电厂取、排水对算山25万吨级码头的影响[J]. 浙江大学学报(理学版), .

Zhou Qiwu;Cai Tilu. The Effects of the Water,Intake and Drainedby Beilun Power Plant,on the Tidal Current Field Nearthe Wharf Area of Suan-Shan 250000t. Journal of ZheJIang University(Science Edition), .

链接本文:

http://www.zjujournals.com/sci/CN/        http://www.zjujournals.com/sci/CN/Y1994/V21/I4/427

No related articles found!