二元联系数-投影灰靶决策理论在电网应急能力评估中的应用
黎振宇,陈晓国,宋永超,龚建平,余志纬,朱永兴,鲁周勋

Application of binary connection number-projection grey target decision theory in power system emergency capability evaluation
Zhen-yu LI,Xiao-guo CHEN,Yong-chao SONG,Jian-ping GONG,Zhi-wei YU,Yong-xing ZHU,Zhou-xun LU
表 2 电网应急能力指标初始数据表
Tab.2 Initial data sheet of power grid emergency capability indicators
指标 x11 x12 x21 x22 x23 x24 x25 x26 x27 x31
[0.5,0.6,0.7] [0.6,0.7,0.8] 0.40 [0.6,0.7,0.8] [0.5,0.6,0.7] [0.6,0.7,0.8] 20 [0.5,0.6,0.7] [0.5,0.6,0.7] 19
[0.7,0.8,0.9] [0.7,0.8,0.9] 0.53 [0.7,0.8,0.9] [0.6,0.7,0.8] [0.7,0.8,0.9] 21 [0.7,0.8,0.9] [0.6,0.7,0.8] 36
[0.7,0.8,0.9] [0.7,0.8,0.9] 0.50 [0.6,0.7,0.8] [0.6,0.7,0.8] [0.6,0.7,0.8] 16 [0.6,0.7,0.8] [0.5,0.6,0.7] 17
指标 x32 x33 x41 x42 x43 x51 x52 x53 x61 x62
0.28 [0.6,0.7,0.8] [0.5,0.6,0.7] [0.6,0.7,0.8] [0.6,0.7,0.8] [30,45] [35,45] [0.5,0.6,0.7] [0.6,0.7,0.8] [0.7,0.8,0.9]
0.35 [0.7,0.8,0.9] [0.5,0.6,0.7] [0.7,0.8,0.9] [0.7,0.8,0.9] [20,40] [30,35] [0.6,0.7,0.8] [0.7,0.8,0.9] [0.8,0.9,1.0]
0.30 [0.7,0.8,0.9] [0.5,0.6,0.7] [0.7,0.8,0.9] [0.6,0.7,0.8] [35,45] [30,40] [0.5,0.6,0.7] [0.7,0.8,0.9] [0.7,0.8,0.9]