装配式结构套筒灌浆连接的混凝土结合界面直剪性能试验研究
|
夏晋,甘润立,方言,赵羽习,金伟良
|
Experimental study on direct shear performance of concrete-concrete interface of prefabricated structure sleeve grouting connection
|
Jin XIA,Run-li GAN,Yan FANG,Yu-xi ZHAO,Wei-liang JIN
|
|
表 4 混凝土结合界面直剪试验结果 |
Tab.4 Direct shear test results of concrete-concrete interface |
|
试件编号 | Fc / kN | Fca / kN | sc / mm | Fmax / kN | Fmaxa / kN | R | sF,max / mm | 试件破坏模式 | A-1-1 | 75 | 83.0 | 0.066 1 | 82 | 88.3 | 1.00 | 0.072 2 | 界面破坏 | A-1-2 | 84 | 0.064 0 | 89 | 0.081 6 | A-1-3 | 90 | 0.070 4 | 94 | 0.080 1 | A-2-1 | 86 | 93.3 | 0.026 8 | 96 | 101.0 | 1.14 | 0.034 5 | A-2-2 | 86 | 0.041 0 | 90 | 0.051 6 | A-2-3 | 108 | 0.026 1 | 117 | 0.037 0 | A-3-1 | 167 | 143.3 | 0.028 0 | 152 | 149.3 | 1.69 | 0.028 0 | A-3-2 | 158 | 0.012 3 | 158 | 0.012 3 | A-3-3 | 105 | 0.026 1 | 138 | 0.026 1 | B-1-1 | 124 | 90.0 | 0.042 5 | 145 | 139.3 | 1.58 | 1.402 0 | 界面破坏,下降段发生 局部破坏 | B-1-2 | 76 | 0.151 2 | 133 | 1.617 3 | B-1-3 | 70 | 0.132 8 | 140 | 0.734 0 | B-2-1 | 76 | 96.3 | 0.121 0 | 175 | 166.7 | 1.89 | 2.659 0 | B-2-2 | 85 | 0.142 9 | 154 | 1.129 2 | B-2-3 | 128 | 0.401 3 | 171 | 2.016 8 | C-1-1 | 368 | 367.0 | 2.939 0 | 526 | 535.0 | 6.06 | 5.268 0 | 界面破坏 | C-1-2 | 351 | 2.133 7 | 524 | 5.000 4 | C-1-3 | 382 | 2.124 5 | 555 | 3.872 1 | C-2-1 | 538 | 483.7 | 2.629 8 | 730 | 690.0 | 7.81 | 3.441 0 | 界面破坏伴随局部裂缝 | C-2-2 | 468 | 2.775 1 | 660 | 4.250 0 | C-2-3 | 445 | 2.000 5 | 680 | 2.792 1 |
|
|
|