Please wait a minute...
浙江大学学报(工学版)
土木工程、交通工程     
基于建筑信息模型的房建施工木模板计算及管理方法
郑顺义, 魏海涛, 赵丽科, 黄荣永
1. 武汉大学 遥感工程学院,湖北 武汉430079
2. 武汉大学 地球空间信息技术协同创新中心,湖北 武汉430079
3. 广西大学 海洋学院,广西 南宁 530004
BIM-based method for calculating and managing wooden template required for housing construction
ZHENG Shun yi, WEI Hai tao, ZHAO Li ke, HUANG Rong yong
1. School of Remote Sensing and Information Engineering, Wuhan University, Wuhan 430079, China;
2. Collaborative Innovation Center for Geospatial Technology, Wuhan University, Wuhan 430079, China;
3. School of Marine Sciences, Guangxi University, Nanning 530004, China
 全文: PDF(1980 KB)   HTML
摘要:

针对房建施工过程中木质模板用量预算不准确以及因缺少精细化管理模板的方法,造成施工过程中模板管理粗放,浪费严重,施工成本增加的问题,提出基于建筑信息模型(BIM)技术计算模板用量及管理的方法.该方法根据结构施工图纸和施工方案创建BIM模型,结合施工规范计算模板的用量.该方法在计算模板用量的同时,生成了模板的用量报表、模板加工图纸和施工图纸,施工企业根据用量报表采购模板材料,根据加工图纸集中加工模板,根据施工图纸管理工人施工,可以有效地减少模板加工过程中的浪费,提高施工速度和质量,最终降低施工成本.在山西农业大学综合实验大楼项目中,对提出的方法进行应用.结果表明,该方法计算模板的用量精确,按照该方法生成的图纸进行加工和施工能够有效地减少模板的浪费,降低模板的用量,节约施工成本.

Abstract:

A building information model(BIM)-based method of calculating and managing the wooden template was proposed in order to address the problems of extensive management and heavy waste of template and the incensement of construction cost during housing construction resulting from budgetary inaccuracy of ligneous template usage and a lack of comprehensive or highlevel management. BIM model was constructed according to construction drawings and project. Then the usage of template was calculated based on job specification. The proposed method can compute the usage of template, and simultaneously produce the dosage report, processing drawings and construction drawings of template which were utilized to assist construction enterprises in purchasing template and centralizing the processing of the required template and managing construction respectively. The method can efficiently reduce the material waste in the process, improve the speed and the quality of the construction and thus lower construction costs. The method was successfully applied in a comprehensive and experimental building project at Shanxi Agricultural University, which validated the accuracy of the proposed method in computing the amount of the template. Construction process that is in compliance with the generated drawings can reduce the usage and waste of template, and save construction costs.

出版日期: 2017-01-01
CLC:  TU 17  
基金资助:

国家自然科学基金资助项目(41671452).

作者简介: 郑顺义(1973—),男,教授,从事计算机视觉与BIM技术的研究.ORCID:0000-0001-5594-3493. E-mail:syzheng@whu.edu.cn
服务  
把本文推荐给朋友
加入引用管理器
E-mail Alert
作者相关文章  

引用本文:

郑顺义, 魏海涛, 赵丽科, 黄荣永. 基于建筑信息模型的房建施工木模板计算及管理方法[J]. 浙江大学学报(工学版), 10.3785/j.issn.1008-973X.2017.01.003.

ZHENG Shun yi, WEI Hai tao, ZHAO Li ke, HUANG Rong yong. BIM-based method for calculating and managing wooden template required for housing construction. JOURNAL OF ZHEJIANG UNIVERSITY (ENGINEERING SCIENCE), 10.3785/j.issn.1008-973X.2017.01.003.

[1] 鲁班咨询.建筑业高增长时代渐行渐远——中国建筑业2014年二季度报告[EB/OL].2015-05-10. http:∥www.lubanway.com/index.phpcontroller=guandian&action=guandian_front&guandian_id=414.
[2] 中国市场调研网.2015年中国建筑设计市场现状调查与未来发展前景趋势报告[EB/OL].2015-05-12. http:∥www.20087.com/201411/JianZhuSheJiFaZhanQuShiFenXi.html.
[3] 建设部.绿色施工导则[J].施工技术,2007,36(11): 14.
CONSTRUCTION M O. Guidelines for green construction [J]. Construction Technology, 2007, 36(11): 14.
[4] GOLDBERG H E. AEC from the ground up: the building information modelin the AEC world, BIM is poised to lead the next big technological evolution [J]. CADalyst, 2004, 21(11): 56-61.
[5] Smith D. United states Building Informati0n Model Standard [C]∥2nd Congress on Digital Collaboration in the Building Industry. Washington DC: American Institute of Architects, 2005.
[6] HAN N, YUE Z F, LU Y F. Collision detection of building facility pipes and ducts based on BIM technology\[J\]. Advanced Materials Research, 2012, 346:312-317.
[7] KIM I, KIM J, SEO J. Development of an IFCbased IDF converter for supporting energy performance assessment in the early design phase [J]. Journal of Asian Architecture and Building Engineering, 2012, 11(2):313-320.
[8] BRYDE D, BROQUETAS M, VOLM J M. The project benefits of building information modelling (BIM) [J]. International Journal of Project Management, 2013,31(7): 971-980.
[9] PORWAL A, HEWAGE K N. Building information modeling (BIM) partnering framework for public construction projects [J]. Automation in Construction, 2013, 31: 204-214.
[10] ARAYICI Y, COATES P, KOSKELA L, et al. Technology adoption in the BIM implementation for lean architectural practice [J]. Automation in Construction, 2011, 20(2): 189-195.
[11] WANG Y, WANG X, WANG J, et al. Engagement of facilities management in design stage through BIM: framework and a case study [J]. Advances in CivilEngineering, 2013, 2013(3): 1275.
[12] 范喆.基于BIM技术的施工阶段4D资源动态管理[D].北京:清华大学, 2010.
FAN Zhe. BIMbased 4D resources dynamic management in construction [D]. Beijing: Tsinghua University, 2010.
[13] 胡振中,张建平,张新.基于四维时空模型的施工现场物理碰撞检测[J].清华大学学报:自然科学版,2010(6): 820-825.
HU Zhenzhong, ZHANG Jianping, ZHANG Xin. Construction collision detection for site entities based on 4D spacetime model [J]. Journal of Tsinghua University: Science and Technology, 2010(6): 820-825.
[14] 许娜,张雷.基于BIM技术的建筑供应链协同研究[J].北京理工大学学报,2014(12): 1315-1320.
XU Na, ZHANG Lei.Optimaization of building industry supply chain based on BIM technology [J]. Transactions of Beijing Institute of Technology, 2014(12): 1315-1320.
[15] 王宇佳,王佳,于辉.BIM技术在建筑工程施工管理中的应用探索[J].土木建筑工程信息技术,2016, 8(4): 89-93.
WANG Yujia, WANG Jia, YU Hui. Reserarch on the application of BIM technology in the building construction management [J]. Journal of Information Technology in Civil Engineering and Architecture, 2016, 8(4): 8993.
[16] 胡振中,陈祥祥,王亮.基于BIM的管道预制构件设计技术与系统研发[J].清华大学学报:自然科学版,2015(12): 12691275.
HU Zhenzhong, CHEN Xiangxiang, WANG Liang, et al. BIMbased design method for prefabricated pipeline components [J]. Journal of Tsinghua University: Science and Technology, 2015(12): 1269-1275.
[17] 张建平,张洋,张新.基于IFC的BIM三维几何建模及模型转换[J].土木建筑工程信息技术,2009, 1(1):40-46.
ZHANG Jianping, ZHANG Yang, ZHANG Xin. Methodology of 3D geometric modeling and model conversion of IFC 2based BIM [J]. Journal of Information Technology in Civil Engineering and Architecture, 2009, 1(1): 40-46.
[18] CHEW L P. Constrained delaunay triangulations [J]. Algorithmica, 1989, 4(14): 97-108.
[19] LEE G, SACKS R, EASTMAN C M. Specifying parametric building object behavior (BOB) for a building information modeling system [J]. Automation in Construction, 2006, 15(6): 758-776.
[20] SACKS R, EASTMAN C M, LEE G. Parametric 3D modeling in building construction with examples from precast concrete [J]. Automation in Construction, 2004, 13(3): 291-312.

No related articles found!